Complete Guide to LESCO Solar Net Metering & Green Meter Installation

By Editorial Team · Published August 29, 2026 · 8 min read

Installing an on-grid solar photovoltaic (PV) system with LESCO Net Metering enables residential and commercial consumers to export surplus daytime solar electricity to the LESCO grid, dramatically reducing or eliminating monthly electricity bills through credit offset.

7 Steps to LESCO Net Metering Approval

  1. Select an AEDB Certified Solar Installer: Hire an Alternative Energy Development Board (AEDB) certified vendor (Category C-1, C-2, or C-3) to design the system.
  2. Application Preparation: Prepare the standard NEPRA Schedule-I application form along with single-line wiring diagrams and equipment datasheets (Tier-1 solar panels & approved on-grid three-phase inverters).
  3. Site Inspection & NOC: LESCO Sub-Divisional technical staff inspects the premises to ensure transformer capacity has available hosting room (up to 80% of distribution transformer rating).
  4. Agreement Signing: Execute the 3-year renewable Net Metering Agreement with LESCO.
  5. NEPRA Generation License: LESCO forwards the dossier to NEPRA for official generation license issuance.
  6. Demand Notice Payment & Meter Testing: Pay the Demand Notice for the bi-directional Green Meter and submit the meter for testing at LESCO Meter Testing Laboratory (MTI).
  7. Green Meter Commissioning: LESCO operations team installs the bi-directional meter and activates grid connection.

Check Your Live Duplicate Bill Online

Enter your 14-digit reference number to check and download your latest electricity bill instantly:

Check Online Bill